Futuristic Miner
Blueprint: Futuristic Miner Mk.2; Game: Modded; Dependencies: Structural Solutions, Conveyor Wall Hole; The blueprint contains both the miner and the frame, all you need to do is to center the hologram on the node and nudge it down until it's frame is flush with the ground. It also features a 100MW power storage, a switch and a throughput monitor; Snaps to foundations. (WARNING: Do not dismantle the conveyor between the miner and wall hole, throughput monitor is linked to it and will no longer work)
- Blueprint Designer Used
- Blueprint Designer Mk.3 (6x6x6)
- Modded Content
- Yes
- Author
- AETERNAL
- Last Updated
- 03:05 11/06/2026
Architecture
Decoration
Miner
Production
Login to leave a comment or rating
Comments
No one has left any comments