Categories

Architecture Power Generation Production Logistics Organisation Transportation

Train ramp end

Train blue print. Put down a beam connector at the top of the arch after building and then remove the middle pillar. Connect the blue prints using the Ficsit foundations at the bottom. Remember to connect the train tracks, these no not link up when putting down several blue prints.

Blueprint Designer Used
Blueprint Designer Mk.1 (4x4x4)
Modded Content
No
Author
Zigiran
Last Updated
03:57 11/09/2026
Train

Login to leave a comment or rating

Comments

No one has left any comments