Categories

Architecture Power Generation Production Logistics Organisation Transportation

Liquid Tower Top mk2

This is the top of the liquid tower, now with mk2 pumps, pipes, and wall outlets. you will still need to place some pipes but all the connections are already there. line up the blueprint by making sure the wall power outlet is to your left as shown in image 2.

Blueprint Designer Used
Blueprint Designer Mk.1 (4x4x4)
Modded Content
No
Author
Hydration Patrol
Last Updated
20:49 12/08/2026
Towers

Login to leave a comment or rating

Comments

No one has left any comments