Arm front - construction crane
A blueprint with a piece of a construction crane: cabin. Intended for placing at the end of the main crane arm. The rest of the arm (except the hoist winch) has to be built manually. Arrow indicates the direction of the main crane arm.
- Blueprint Designer Used
- Blueprint Designer Mk.2 (5x5x5)
- Modded Content
- No
- Author
- nvix
- Last Updated
- 05:17 16/07/2026
Architecture
Login to leave a comment or rating
Comments
No one has left any comments