Categories

Architecture Power Generation Production Logistics Organisation Transportation

MK3 - Pressure Conversion Cube 2PM ALT (1of3)

Pressure Conversion Cube 2PM ALT Part 1 of 3 PART OF A SET, USELESS ON ITS OWN

Blueprint Designer Used
Blueprint Designer Mk.3 (6x6x6)
Modded Content
No
Author
mostly_useless
Last Updated
03:19 16/04/2026
Pressure Conversion Cube Production

Login to leave a comment or rating

Comments

  1. mostly_useless
    Floor 3 - Far left corner needs a mk5 lift going from the merger to the ceiling hole Floor 5 - Far left corner needs a mk5 lift going from the floor hole to the ceiling hole - The output from the high-speed connector manufacturer goes up high to the middle of the right hand side; that needs a mk5 lift added to that ceiling hole.
  2. mostly_useless
    Hi R, thanks for taking the time for the feedback. I've just rebuilt this and it works for me. I think you may have missed some internal connections that go between blueprints.
  3. R
    Even after combining the 3 plans listed, there is still no radio control unit production, just an empty ceiling hole where it should enter. I downloaded the corresponding factory for the radio control unit and placed it on the very top then ran a path to the correct hole 3 floors down, and it now works. I guess it wqs just an oversite by the blueprint maker but I'm suprised no one else has commented on the plans not working when put together.